Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: yellow图片在线观看 | 日本高清免费不卡在线播放 | 精品国产一区二区三区19 | 国产a久久精品一区二区三区 | 猫咪视频成人永久免费观看 | 成人精品在线观看 | 国产成人综合亚洲欧美在 | 成人国产在线视频在线观看 | 国产亚洲精品福利在线 | 成人在免费观看视频国产 | www日本免费视频 | 国产香蕉视频在线播放 | 国产精品久久久久久久久久久威 | 久久亚洲精品成人综合 | 国产在线高清视频 | 爱爱欧美视频 | 成年人毛片视频 | 国产亚洲精品美女久久久 | 国内成人免费视频 | a网站在线观看 | 久久精品国产大片免费观看 | 成人免费真人毛片视频 | 国产免费小视频在线观看 | 国产欧美二区三区 | 黄网在线免费观看 | 成人在线观看免费爱爱网站 | 青青草国产免费久久久91 | 国产精品日韩一区二区三区 | 国产特黄a级在线视频 | 久久青青草原 | 黄色免费在线观看网站 | 99精品在线视频观看 | 国产小视频在线观看 | 韩国一级永久免费观看网址 | 国产欧美日韩精品第三区 | 精品一区二区三区在线成人 | 国产精品久久久久一区二区三区 | 欧美成人性h版 | 成人精品视频在线观看播放 | 91精品久久久久久久久久小网站 | 欧美日韩成人在线观看 |