Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 国产精品成人h片在线 | 高清一区二区三区免费 | 日韩欧美亚洲中字幕在线播放 | 久久精品国产精品亚洲综合 | 欧美日韩亚洲精品国产色 | 日韩免费观看视频 | 99热国产| 欧美操穴 | 国产成人精品免费视频大全办公室 | 国产一区亚洲 | 97人人干 | 国产福利区一区二在线观看 | 欧美日韩在线成人免费视频大全 | 国产一区二区三区在线观看视频 | 国产亚洲精品色一区 | 国产年成美女网站视频免费看 | 麻豆视频一区二区三区 | 福利视频一区二区三区 | 成年午夜 | 成人网18免费网站在线 | 日本一级毛片免费看 | 日本一区二区三区精品国产 | 久久99亚洲精品一区二区 | 国产午夜视频在线观看网站 | 欧美一区二区在线观看视频 | 国产成人综合自拍 | 日韩电 影在线播放 | 黄色aⅴ | 欧美 自拍 丝袜 亚洲 | 成人黄色一级视频 | 久久精品一级 | 成人a毛片免费视频观看 | 久久亚洲人成国产精品 | 51vv福利视频在线 | xxxxxwwwww日本 | jazz国产乱在线视频 | 国产成人精品高清在线观看99 | 国产精品嫩草研究院成人 | 国产午夜毛片v一区二区三区 | 久夜色精品国产一区二区三区 | 黑人中文字幕在线精品视频站 |